Friday, 12 February 2016

Gas output from RIL's D-6 block in terminal decline: No more sidetracking in D-1 and D-3 blocks

Output from the D-6 block continues to go down, according to latest reports, and is likely to do so sharply in 2016-17 as the RIL-BP duo have decided to halt further side tracking work in the D-1 and D-3 fields on account of diminishing returns resulting from increasing..http://goo.gl/WNluOb

Click on the following links for more on this story: 

No comments:

Post a Comment