Friday, 1 July 2016

Collaborative model for KG Basin gas: D-6 operating cost is low compared to global benchmarks

That the RIL-BP combine had kept the operating cost in the D-6 block at 1.45/mmbtu is something that is indeed quite laudable.
8An analysis done by this website shows that the D-6 operating cost is quite reasonable and in fact is on the lower side when compared to other..http://goo.gl/WNluOb

Click on the following link for more on this story:
Collaborative model for KG Basin gas: "Hub" concept works in Gulf of Mexico

No comments:

Post a Comment