Water based mud will be used during the drilling operation and drill cuttings generated along with waste mud, will be washed, and separated for reuse after improving their properties.
8Moreover, maximum amount of produced associated and non associated gas will be sold to local buyers and rest will be used internally in the indirect bath heater to heat the oil and for maintaining the mobility of crude oil for transportation.
8It is expected that waste oil, approx l000 liters per well, will be generated which will be handed over to authorized recyclers.
8For drilling rig operation and lighting purposes, power requirement of 662.5 KVA will be required for each well, which will be met through two DG sets.
8Electricity supply will be sourced from the GEB.
8At each EPS, 8-10 Liters/hr of diesel will be consumed in D.G set (82.5KVA) in case of power failure.
8Water requirement of 40 KLD per well site will be made available through nearest surface water source or through road tankers.
For more details visit indianpetroplus.com
8Moreover, maximum amount of produced associated and non associated gas will be sold to local buyers and rest will be used internally in the indirect bath heater to heat the oil and for maintaining the mobility of crude oil for transportation.
8It is expected that waste oil, approx l000 liters per well, will be generated which will be handed over to authorized recyclers.
8For drilling rig operation and lighting purposes, power requirement of 662.5 KVA will be required for each well, which will be met through two DG sets.
8Electricity supply will be sourced from the GEB.
8At each EPS, 8-10 Liters/hr of diesel will be consumed in D.G set (82.5KVA) in case of power failure.
8Water requirement of 40 KLD per well site will be made available through nearest surface water source or through road tankers.
For more details visit indianpetroplus.com
No comments:
Post a Comment