ONGC's CY-ONN-2002/2 field in Puducherry is expected to being producing gas from 2016-
8Output in the initial two years is going to be low, at 14,000 and 39,000 cubic meters a day (CMD in 2016-17 and 20167-18.
8But then output goes up to 0.25 mmscmd in 2018-19 and then reaches 0.8 mmscmd in 2020-21.
8This is indeed a significant enough output.
8Production begins to come down thereafter, albeit slowly.
8Output comes down to around 0.64 mmscmd in 2027-28
8Gas production projection given for 2032-33 is 0.178 mmscmd.
For more details visit indianpetroplus.com
8Output in the initial two years is going to be low, at 14,000 and 39,000 cubic meters a day (CMD in 2016-17 and 20167-18.
8But then output goes up to 0.25 mmscmd in 2018-19 and then reaches 0.8 mmscmd in 2020-21.
8This is indeed a significant enough output.
8Production begins to come down thereafter, albeit slowly.
8Output comes down to around 0.64 mmscmd in 2027-28
8Gas production projection given for 2032-33 is 0.178 mmscmd.
For more details visit indianpetroplus.com
No comments:
Post a Comment