Bharat Petro Resource Ltd (BPRL) has located six drill sites for drilling in the CB-ONN-2010/8 block in the Cambay basin in Gujarat.
8Depending on the drilling results of the four wells (Location A, B, C & D), BPRL may or may not decide to develop the remaining two optional drill sites.
8Drill sites ‘A’ and ‘D’ are clubbed together as a part of ‘Set - I’ and the remaining dill sites ‘B’ and ‘C’are part of “Set –II".
8The development works of one drillsite will be completed within 60 days, which includes the mobilization time.
For more details visit indianpetroplus.com
8Depending on the drilling results of the four wells (Location A, B, C & D), BPRL may or may not decide to develop the remaining two optional drill sites.
8Drill sites ‘A’ and ‘D’ are clubbed together as a part of ‘Set - I’ and the remaining dill sites ‘B’ and ‘C’are part of “Set –II".
8The development works of one drillsite will be completed within 60 days, which includes the mobilization time.
For more details visit indianpetroplus.com
No comments:
Post a Comment