Monday, 21 September 2015

ONGC’s CY-ONN-2004/2 block: Details of project

The target depth of these wells will be between 3000-4500 meter/ basement.
8The drilling rig used in the block will be electrically operated.
8Only the water based drilling mud will be used for drilling appraisal wells.
8For the proposed project 4 to 5 acres of land will be acquired for each well.
8Drilling will continue for about 60-75 days for each well in the block.
8The power requirement of the drilling rig will be met by using the six DG sets.

For more details visit indianpetroplus.com

No comments:

Post a Comment